Seite 1 - 135 Ft Diameter Bin

135 Ft Diameter BinModels:40–SERIES BINConstruction ManualPNEG-4135Date: 10-18-13PNEG-4135

Seite 2

Chapter 1: Safety PrecautionsTable 1-1 Description of the different cautionary symbols (cont'd.)Symbol DescriptionThis symbol indicates a potenti

Seite 3 - Contents

Chapter 7: Roof AssemblyFigure 7-17 Purlin location 4A Left-hand lower roof rafter (CTR-0239) H Laminated purlin (CTR-0308 and CTR-0504)B1/2 x 1-3/4 i

Seite 4 - Table of Contents

Chapter 7: Roof AssemblyAssembling Purlin Number 3Purlin number 3 is located second from the eave.Before You BeginPlace two roof rafters on the ground

Seite 5

Chapter 7: Roof AssemblyFigure 7-18 Purlin location 3A Left-hand lower roof rafter (CTR-0239) H Laminated purlin (CTR-0299 and CTR-0300)B1/2 x 1-3/4 i

Seite 6

Chapter 7: Roof AssemblyAssembling Purlin Number 2Purlin number 2 is located second to the eave.Before You BeginPlace two roof rafters on the ground w

Seite 7 - 1 Safety Precautions

Chapter 7: Roof AssemblyFigure 7-19 Purlin location 2A Left-hand lower roof rafter (CTR-0239) H Laminated purlin (CTR-0298 and CTR-0503)B1/2 x 1-3/4 i

Seite 8

Chapter 7: Roof AssemblyAssembling Purlin Number 1Purlin number 1 is located closest to the eave.Before You BeginPlace two roof rafters on the ground

Seite 9 - Cautionary Symbols

Chapter 7: Roof AssemblyFigure 7-20 Purlin location 1A Left-hand lower roof rafter (CTR-0239) H Purlin (CTR-0297)B1/2 x 1-3/4 in. flange bolt (S-10252

Seite 10 - Safety Decals

Chapter 7: Roof AssemblyAssembling a Double A-FrameTo achieve the required spacing between each A-frame, a double A-frame will need to be assembled pr

Seite 11 - Chapter 1: Safety Precautions

Chapter 7: Roof AssemblyFigure 7-22 Double A-frame assembly exploded viewA Roof rafter (CTR-0236 and CTR-0239) F 1/2 x 1-3/4 in. flange bolt (S-10252)

Seite 12

Chapter 7: Roof AssemblyAssembling Center Collar Channels and Cap PlatesThe following procedure is for assembling the center collar channels and cap p

Seite 13 - Safety Sign-off Sheet

Chapter 1: Safety PrecautionsATTENTION: Decal shown below must be present on the outside of the door cover of the two ring, 24 in.(61 cm) porthole doo

Seite 14

Chapter 7: Roof Assembly8. Install the short center collar channels (F) to the third set of holes located on each long center collarchannel (I).9. Ins

Seite 15 - 2 General Overview

Chapter 7: Roof AssemblyFigure 7-25 Assembling the short center collar channels to the long center collar channelC 1/2 x 1-3/4 in. flange bolt (S-1025

Seite 16 - Chapter 2: General Overview

Chapter 7: Roof AssemblyFigure 7-26 Assembling the short center collar channels to the long center collar channelC 1/2 x 1-3/4 in. flange bolt (S-1025

Seite 17

Chapter 7: Roof AssemblyFigure 7-27 Assembling the center cap platesA3/8 in. nut (S-456)N Tube caulkICenter collar channel assembly O Splice plate (CT

Seite 18 - Construction

Chapter 7: Roof AssemblyFigure 7-28 Assembly of side cap platesA3/8 in. nut (S-456) Q Side cap plate (CTR-0360), approximately 145lb (65.77 kg)LCenter

Seite 19

Chapter 7: Roof AssemblyNOTE: Eyebolt will pass through three layers of steel: the splice plate (V), the center cap plates (Land M), and the long cent

Seite 20

Chapter 7: Roof AssemblyDetermine the correct orientation of the center collar in relation to any stairs or conveyor systems. Eachpiece of the center

Seite 21 - Sample Gauge Sheet

Chapter 7: Roof Assembly6. Secure with flange bolts (L) and flange nuts (J).7. Locate the column of three holes (K) that are not paired together on th

Seite 22

Chapter 7: Roof Assembly10.Loosely tighten all of the hardware allowing the center collar pieces to be adjusted for alignment afterthe center collar c

Seite 23

Chapter 7: Roof AssemblyFigure 7-32 Assembling the center collar channels and cap plates assemblyQ Appropriate lifting chains S Cap plate assembly, ap

Seite 24

Chapter 1: Safety PrecautionsATTENTION: Decal shown below must be present on the outside of the door cover of the two ring, 24 in.(61 cm) porthole doo

Seite 25 - 3 Hardware Requirements

Chapter 7: Roof AssemblyCenter Collar PlacementThe following figure gives the approximate height needed to install the center collar.With two sidewall

Seite 26 - Bolt Torque Specifications

Chapter 7: Roof AssemblyIMPORTANT: The ladder assembly (A or B or C or D) and the manway hole (I or J or K or L) locationsmust be determined before th

Seite 27 - Identifying Bolt Grades

Chapter 7: Roof AssemblyGuidelines for Assembling and Lifting the A-Frame Rafter SectionsThe roof is assembled in sections and referred to as A-frame

Seite 28

Chapter 7: Roof AssemblyFigure 7-36 Recommended lifting points for a Double A-frame sectionA Purlin clipThe A-frame rafter section has two configurati

Seite 29 - Bolt S-277

Chapter 7: Roof Assembly• Before attempting a lift, adjust each lifting cable to achieve the appropriate angle needed (approxi-mately 30 degrees).• As

Seite 30 - Bolt S-7486

Chapter 7: Roof AssemblyFigure 7-37 Exploded view of A-frame to center collarA A-frame rafter assembly C 1/2 x 1-3/4 in. flange bolt (S-10252)B Center

Seite 31 - Bolt S-10252

Chapter 7: Roof AssemblyFigure 7-38 Attaching the rafter to the eave bracketAA-frame rafter assemblyD1/2 in. flange nut (S-10253)B1/2 x 1-3/4 in. flan

Seite 32 - Bolt S-10134

Chapter 7: Roof AssemblyNOTE: Ensure that the orientation of the roof panel clip is correct, roof panel holes facing the roofand the notch in the roof

Seite 33 - Nut S-8479

Chapter 7: Roof AssemblyInstalling the 6–Hole Intermediate PurlinsIntermediate purlins must be installed to connect each A-frame roof rafter assembly

Seite 34

Chapter 7: Roof AssemblyAttaching the Roof PanelsRoof panels overlap the previous roof panel, giving protection from outside elements.Before You Begin

Seite 35 - 4 Assembling Sidewall Sheets

Chapter 1: Safety PrecautionsSafety Sign-off SheetSign-off sheet verifying that all personnel have read and understood the safety instructions.As a re

Seite 36

Chapter 7: Roof AssemblyALower roof panel (CTR-0344)E5/16 in. flange nut (S-3611)D5/16-18 x 1 flange bolt with sealing washer(S-10260)G Roof rafter3.

Seite 37

Chapter 7: Roof Assembly7. After installing all the lower roof panels onto the roof, with assistance, position an middle roof panel(D) onto a A-frame

Seite 38

Chapter 7: Roof AssemblyFigure 7-44 Installing the middle roof panelsALower roof panel (CTR-0344)F5/16 in. flange nut (S-3611)DMiddle roof panel (CTR-

Seite 39

Chapter 7: Roof AssemblyFigure 7-45 Installing the first upper roof panelC Upper roof panel (CTR-0337)E5/16-18 x 1 flange bolt with sealing washer (S-

Seite 40

Chapter 7: Roof AssemblyFigure 7-46 Installing the middle roof panelsC Upper roof panel (CTR-0337) F 5/16 in. flange nut (S-3611)D Middle roof panel (

Seite 41

Chapter 7: Roof Assembly22.Field drill holes (C) into the roof panels (A) through holes in the top flange of the rafters (E). Fastenthe panels and the

Seite 42

Chapter 7: Roof AssemblyC Roof panel holes (drilled through rafter) G Roof panel holes (drilled through rafter clip)D PurlinInstalling the Roof Flashi

Seite 43 - 5 Base Angle Installation

Chapter 7: Roof Assembly3. Place a strip of rope caulk (D) along the edge of the installed roof flashing (A) where the next roofflashing will overlap.

Seite 44 - example

Chapter 7: Roof AssemblyInstalling Center Collar Channels and Cap Plates AssemblyThe following procedure is for installing the center collar channels

Seite 45 - Anchor Bolt Detail

Chapter 7: Roof AssemblyFigure 7-49 Lifting the center collar channel and cap platesA Tube caulk D Cap plate assembly, approximately 1700 lb(771.1 kg)

Seite 46

NOTES14 Pneg-4135 135 Ft Diameter 40-Series Bin

Seite 47

Chapter 7: Roof AssemblyFigure 7-50 Cap plate assembly installedG 3/8 x 1 in. bolt with sealing washer (S-7487)IHoles for conveyor support bracketsH3/

Seite 48

Chapter 7: Roof AssemblyFigure 7-51 Conveyor support bracketsA3/8 x 1-1/2 in. flange bolt (S-7488) C 3/8 in. flange nut (S-456)BConveyor support brack

Seite 49 - 6 Stiffeners

NOTES142 Pneg-4135 135 Ft Diameter 40-Series Bin

Seite 50 - Chapter 6: Stiffeners

8 AccessoriesTopics Covered in this Chapter▪ Installing Roof Ladder Steps▪ Roof Ring Placement▪ Installing a Roof Ring▪ Installation of Peak–To– Exhau

Seite 51 - Laminated and Thicker Only)

Chapter 8: AccessoriesInstalling Roof Ladder StepsRoof ladder steps will allow access to roof and manway access.What You Should KnowEach eave-to-peak

Seite 52 - Standard Stiffeners

Chapter 8: AccessoriesUse the following table as a guide to the location of each ladder step (rung).Table 8-1 Ladder Rung Placement ChartBin DiameterL

Seite 53 - Top Stiffeners

Chapter 8: AccessoriesNOTE: The table above shows the correct ladder step and part number to be installed in the correspondinghole in the roof rib. Sh

Seite 54 - Stiffeners Splice

Chapter 8: AccessoriesInstalling a Roof RingQuantity and part numbers of roof ring kits vary with the location placement and with the size of each bin

Seite 55 - Base Stiffeners

Chapter 8: Accessories6. Install the threaded stud (F) with stud nuts (G) to the end of the roof ring section (B).NOTE: Install the threaded stud (F)

Seite 56 - Base Boots

Chapter 8: AccessoriesInstallation of Peak–To– Exhauster Ladder KitBefore installing the roof exhauster, the peak-to-exhauster ladder kit may be insta

Seite 57 - Connection

2 General OverviewTopics Covered in this Chapter▪ General Information▪ Anchor Bolt Charts▪ Tools Required for Construction▪ Guidelines for Proper Stor

Seite 58 - Stiffener (16 Ga)

Chapter 8: AccessoriesTable 8-2 Peak-to-Exhauster Ladder Rung KitBin DiameterLocation 72 ft 75 ft 78 ft 90 ft 105 ft 135 ft↑Bin Peak37 LS-260-136 LS-2

Seite 59

Chapter 8: Accessories1. Position the roof panels (K) spanned by the roof exhauster mounting plate on the ground. Align theroof panel holes as if they

Seite 60 - (2–8 Ga) Connection

Chapter 8: Accessories5. Remove the roof exhauster mounting plate (F), to make the necessary cut along the mark or scribe(I).Figure 8-7 Using the roof

Seite 61 - Base Stiffener (2–8 Ga)

Chapter 8: AccessoriesFigure 8-8 Roof exhauster assemblyA5/16 x 1 in. hex bolt (S-10260)D5/16 in. flange nut, (S-3611)BRoof exhauster hoodEExhauster m

Seite 62

Chapter 8: AccessoriesNOTE: The roof exhauster kit is shipped with additional parts. The following part numbers will not be usedon 40-series bins:MIS-

Seite 63 - Stiffener (10–16 Ga)

Chapter 8: AccessoriesFigure 8-9 Installing roof exhausterARoof exhauster flashing (CTR-0347)E5/16 flange nut (S-3611)B5/16-18 x 1 flange bolt, with s

Seite 64

Chapter 8: AccessoriesFigure 8-10 Sealing caulk locationDRoof exhauster assemblyHSealing caulkAssembling the Auto Roof VentThe following instructions

Seite 65

Chapter 8: AccessoriesFigure 8-11 Auto roof vent assemblyAHold-down angle (MIS-4404)DRoof vent housing assembly (MIS-6778)B5/16 x 1-1/4 in hex bolt (S

Seite 66

Chapter 8: Accessories5. Insert another hex bolt (B) through the other side of the roof vent housing (D), and install a flange nut(E) to the hex bolt

Seite 67 - Base Boot

Chapter 8: AccessoriesInstalling the Roof VentsThe following instructions are for installing the wire grill guard roof vent and the auto roof vent.Bef

Seite 68 - Stiffener with Insert

Chapter 2: General OverviewFigure 2-1 Anchor bolt chords for 135 diameter 3–post binBolt Radius (B)Anchor Quantityft and inm67 – 6-1/2 20.587 13516 Pn

Seite 69

Chapter 8: AccessoriesInstalling the Manway CoverInstallation of a manway cover is necessary if a manway hole is present.1. Install each hinge base (A

Seite 70

Chapter 8: AccessoriesFigure 8-14 Manway coverAHinge base (MW-291) GManway sillBManway roof panel (CTR-0302)HHinge leaf (MW-272)C 5/16 x 3/4 in. hex b

Seite 71

Chapter 8: AccessoriesNOTE: A portion of the last ladder section may need to be cut to fit the proper length to the ground or tothe intermediate platf

Seite 72

Chapter 8: AccessoriesFigure 8-16 Positioning the ladderA Manway access B Ladder assembly1. Install the right-hand starter bracket (C) to the top hole

Seite 73 - 7 Roof Assembly

Chapter 8: Accessories7. Tighten hardware to the recommended torque specifications. See Bolt Torque Specifications, page26.8. Install the ladder (B) t

Seite 74

Chapter 8: AccessoriesFigure 8-17 Installing ladder bracketsB Ladder assembly J5/16 in. hex bolt (S-275)C Starter bracket (RH LDR-4347)KStarter bracke

Seite 75

Chapter 8: AccessoriesInstalling Inside Ladder Bottom BracketThe ladder bottom bracket keeps the lower portion of the ladder secure.What You Should Kn

Seite 76

Chapter 8: AccessoriesFigure 8-18 Bottom ladder bracketA Ladder assembly E5/16 x 3/4 in. flange bolt (S-7482)BLadder bottom bracket (LDR5133)F3/8 in.

Seite 77

Chapter 8: Accessories• Installation of multiple systems may require additional wind rings and must be placed a minimum of90 degrees apart. Installati

Seite 78

Chapter 8: AccessoriesFigure 8-19 Two and three post stiffener examplesATypical 24-ring binDTwo post stiffenerBTypical 29-ring binEThree post stiffene

Seite 79

Chapter 2: General OverviewChord (A)Lengthft and inm1 3 – 1-3/4 0.9592 6 – 3-7/16 1.9163 9 – 5-1/8. 2.8734 12 – 6-11/16 3.827515 – 8-1/4 4.7826 18 – 9

Seite 80 - Assembling the Rafters

Chapter 8: AccessoriesTable 8-3 Sidewall Instructions (Two Post Stiffener)Number of Rings on the Bin Chute Location Horizontal Starting LocationAllLoc

Seite 81

Chapter 8: AccessoriesFigure 8-20 First Chute Locations (Two Post Stiffener Only) and Spacing of each baffle chuteAStiffener’s center line G Field dri

Seite 82

Chapter 8: AccessoriesNOTE: Depending on the location of the baffle chute (C), the measurement from the sidewall edgewill vary (D or E).3. Locate the

Seite 83

Chapter 8: AccessoriesEMeasurement from edge of sidewall sheetto center line of baffle chute, 75 in. (190.5cm)KTypical spacing, approximately 8 in. (2

Seite 84

Chapter 8: AccessoriesFigure 8-22 Vertical line location of discharge chuteAColumn of bolt holes C Measurement, approximately 11 in. (27.94 cm)BBaffle

Seite 85

Chapter 8: AccessoriesFigure 8-23 Horizontal line location of discharge chuteD Vertical center line F Center of discharge chute locationE Sidewall hor

Seite 86

Chapter 8: AccessoriesFigure 8-24 Discharge Chute Hole OutlineD Vertical center line G Horizontal center line10.Separate the upper sidewall panel (I)

Seite 87

Chapter 8: AccessoriesFigure 8-25 Discharge chute assembly (view form inside the bin)H Discharge chute assembly J Lower sidewall panelI Upper sidewall

Seite 88

Chapter 8: AccessoriesFigure 8-26 Field drilling discharge chute assembly (view from inside the bin)H Discharge chute assembly K 3/8 x 1-1/2 in. flang

Seite 89

Chapter 8: AccessoriesFigure 8-27 Reinstall baffle chute (view from inside the bin)BBaffle chuteM Field drilled hole location15.Tighten hardware to th

Seite 90 - Assembling a Laminated Purlin

Chapter 2: General OverviewTools Required for ConstructionGeneral tools needed to perform this construction:• Combination wrench set 7/16 in. to 1 in.

Seite 91 - Assembling Purlin Number 8

Chapter 8: AccessoriesWind Ring RequirementsWind rings give additional strength against high winds and uneven loads. The quantities and placement ofwi

Seite 92 - Assembling Purlin Number 7

Chapter 8: AccessoriesFigure 8-29 Dimensions for OSHA Compliant Ladder Rung PlacementNOTE: Ensure the wind rings are installed in rela-tion to the lad

Seite 93

Chapter 8: Accessories1. Install a wind ring bracket (B) to each stiffener (C) using flange bolts (A) and flange nuts (D).Figure 8-30 Wind ring bracke

Seite 94

Chapter 8: AccessoriesFigure 8-31 Exploded view of wind ring installed at upper portion of stiffenerAFlange bolt with sealing washer (partnumber will

Seite 95 - Assembling Purlin Number 6

Chapter 8: AccessoriesFigure 8-32 Weather Cover AssemblyA Universal weather cover plate (CHT-1351)D 5/16 in. flange nut (S-3611)B1/4 in. self-drilling

Seite 96

GSI Group, LLC Limited WarrantyGSI Group, LLC Limited WarrantyThe GSI Group, LLC (“GSI”) warrants products which it manufactures to be free of defects

Seite 97 - Assembling Purlin Number 5

This equipment shall be installed in accordance with thecurrent installation codes and applicable regulationswhich should be carefully followed in all

Seite 98

Chapter 2: General OverviewOverview for a Typical Bin InstallationThese are the typical steps one would perform when constructing a grain bin. Procedu

Seite 99 - Assembling Purlin Number 4

All information, illustrations, photos, and specifications in this manual are based on the latestinformation available at the time of publication. The

Seite 100 - Chapter 7: Roof Assembly

Chapter 2: General OverviewGuidelines for Construction Procedures and Lifting Jack UsageThe following procedure is a guideline when using a required l

Seite 101 - Assembling Purlin Number 3

Chapter 2: General OverviewGuidelines for Placement of the Decal Sidewall SheetUse the following as a general guideline the proper decal sheet placeme

Seite 102

Chapter 2: General OverviewFigure 2-3 Sample Gauge Sheet for a 3-Post 135 Diameter Bin22 Pneg-4135 135 Ft Diameter 40-Series Bin

Seite 103 - Assembling Purlin Number 2

Chapter 2: General OverviewPneg-4135 135 Ft Diameter 40-Series Bin 23

Seite 104

NOTES24 Pneg-4135 135 Ft Diameter 40-Series Bin

Seite 105 - Assembling Purlin Number 1

3 Hardware RequirementsTopics Covered in this Chapter▪ Bolt and Nut Pairings▪ Hardware for 3–Post Sidewall Sheets on Bins that are 135 Ft in Diameter▪

Seite 106

Chapter 3: Hardware RequirementsTable 3-1 Hardware for 3-Post Sidewall Sheets on Bins that are 135 Ft in Diameter (cont'd.)GaugeHorizontal Seam V

Seite 107 - Assembling a Double A-Frame

Chapter 3: Hardware RequirementsIdentifying Bolt GradesBolts are identified by grade (or hardness), the grade can be identified by the markings on the

Seite 108

Chapter 3: Hardware RequirementsColor Chart for Bin Hardware Bucket LidsFor ease of identification, hardware is separated and identified by buckets wi

Seite 109

Chapter 3: Hardware RequirementsBolt IdentificationUse the following information to identify the bolts and where each must be used during installation

Seite 110

Table of ContentsContentsChapter 1 Safety Precautions ...

Seite 111

Chapter 3: Hardware RequirementsBolt S-7485An S–7485 is a 3/8 x 1 in. JS hex bolt with flanged head and without a sealing washer.Bolt (S-7485) is used

Seite 112

Chapter 3: Hardware RequirementsBolt S-7488An S–7488 is a 3/8 x 1 1/2 in. JS bolt that is pre-assembled with a sealing washer.Bolt (S-7488) is used in

Seite 113

Chapter 3: Hardware RequirementsBolt S-10165An S–10165 is a 3/8 x 2 in. JS bolt that is pre-assembled with a sealing washer.Bolt (S-10165) is used in

Seite 114

Chapter 3: Hardware RequirementsBolt S-10261An S–10261 is a 7/16 x 3 1/4 in. JS bolt that is pre-assembled with a sealing washer.Bolt (S-10261) is use

Seite 115 - Assembling the Center Collar

NOTES34 Pneg-4135 135 Ft Diameter 40-Series Bin

Seite 116

4 Assembling Sidewall SheetsTopics Covered in this Chapter▪ Color Codes for Sidewall Gauge Identification▪ Orientation Detail for Top Sidewall Sheets▪

Seite 117

Chapter 4: Assembling Sidewall SheetsTable 4-2 Stripe Colors for Special Sidewall Characteristics (cont'd.)Extra Stripe ColorsType of Sidewall St

Seite 118

Chapter 4: Assembling Sidewall SheetsFigure 4-2 Standard and quad punched sidewall sheets as viewed from the outsideAVertical strip of caulkB10 in. (2

Seite 119

Chapter 4: Assembling Sidewall SheetsFigure 4-3 Caulking detail as viewed from inside of the binC 10 in. (25.4 cm) Strip of caulkD10 in. (25.4 cm) Str

Seite 120 - Center Collar Placement

Chapter 4: Assembling Sidewall SheetsCaulking Detail for Laminated Quad Pattern SheetsTo keep out moisture from overlapping the sheets, it is necessar

Seite 121

Table of ContentsClose-Punch Connection for a One-Ring Top Stiffener (16 Ga) and a Two-Ring Stiffener (16Ga) ...

Seite 122

Chapter 4: Assembling Sidewall SheetsFigure 4-5 Laminated figurate punched sidewall sheets view from outside of the binAStrip of caulkingB12 in. (30.4

Seite 123

Chapter 4: Assembling Sidewall Sheets• When assembling two assembled laminated sheets to each other, apply a strip of caulk (A) near theoutside edge o

Seite 124

NOTES42 Pneg-4135 135 Ft Diameter 40-Series Bin

Seite 125

5 Base Angle InstallationTopics Covered in this Chapter▪ Installing the Base Angle▪ Anchor Bolt Detail▪ Installing the Base Angle Shims▪ Anchor Bolt W

Seite 126

Chapter 5: Base Angle InstallationFigure 5-1 Exploded view of base angle (view from inside the bin)A Final ring assembly D3/8 in. nut (S-9426)BBase an

Seite 127

Chapter 5: Base Angle InstallationAnchor Bolt DetailThe following is the minimum requirement for anchorage on standard tanks. Refer to sidedraw instru

Seite 128

Chapter 5: Base Angle InstallationInstalling the Base Angle ShimsA section of the base boot plate will rest on top of the base angle, therefore causin

Seite 129 - Attaching the Roof Panels

Chapter 5: Base Angle InstallationAnchor Bolt Washer InstallationAnchor bolt washers help to cover the oversized hole in the base plate.Before You Beg

Seite 130

NOTES48 Pneg-4135 135 Ft Diameter 40-Series Bin

Seite 131

6 StiffenersTopics Covered in this Chapter▪ Stiffener Part Number Description▪ Color Codes for Stiffener Gauge Identification▪ Outside Stiffened Lamin

Seite 132

Table of ContentsInstalling the 6–Hole Intermediate Purlins ... 128Atta

Seite 133

Chapter 6: StiffenersStiffener Part Number DescriptionPart numbers are printed on the end of each stiffener with the last two numbers designating the

Seite 134

Chapter 6: StiffenersOutside Stiffened Laminated Stiffener to Sidewall (10 GaugeLaminated and Thicker Only)Use the following information to attach the

Seite 135

Chapter 6: StiffenersStandard StiffenersUse the following information to determine the differences between the types of standard two-ringstiffeners.Fi

Seite 136 - Installing the Roof Flashing

Chapter 6: StiffenersTop StiffenersUse the following information to determine the differences between the three types of top stiffeners.Figure 6-3 Ima

Seite 137

Chapter 6: StiffenersStiffeners SpliceUse the following information to determine the gauge of the splice needed to connect the stiffeners.Figure 6-4 S

Seite 138

Chapter 6: StiffenersBase StiffenersUse the following information to determine the differences between the base stiffeners.Figure 6-5 Images of the ba

Seite 139

Chapter 6: StiffenersBase BootsUse the following information to determine the differences between the base boots.Figure 6-6 Images of the base bootsCa

Seite 140

Chapter 6: StiffenersClose-Punch Connection for a One-Ring Top Stiffener (16 Ga) and aTwo-Ring Stiffener (16 Ga)Reference the following information fo

Seite 141

Chapter 6: StiffenersClose-Punch Connection for a Two-Ring Top Stiffener to a Two-RingStiffener (16 Ga)Reference the following information for a close

Seite 142

Chapter 6: StiffenersClose-Punch Connection for a Two-Ring Stiffener (16 Ga) to aTwo-Ring Stiffener (16 Ga)Reference the following information for a c

Seite 143 - 8 Accessories

NOTES6 Pneg-4135 135 Ft Diameter 40-Series Bin

Seite 144 - Installing Roof Ladder Steps

Chapter 6: StiffenersClose-Punch Connection for a Two-Ring Stiffener (0–14 Ga) to aTwo-Ring Stiffener (0–14 Ga)Reference the following information for

Seite 145 - Chapter 8: Accessories

Chapter 6: StiffenersClose-Punch Connection for a Two-Ring Stiffener (0–14 Ga) to aBase Stiffener (2–8 Ga)Reference the following information when con

Seite 146 - Roof Ring Placement

Chapter 6: StiffenersTwo-Ring Stiffener (2–14 Ga) to a Base Stiffener (10–16 Ga)ConnectionReference the following information for a close-punch connec

Seite 147 - Installing a Roof Ring

Chapter 6: StiffenersClose-Punch Connection for a Two-Ring Stiffener (16 Ga) to a BaseStiffener (10–16 Ga)Reference the following information for a cl

Seite 148

Chapter 6: StiffenersClose-Punch Two-Ring Stiffener (2–14 Ga) to a Laminated Stiffener(2 Ga) with an Insert (10–14 Ga)Reference the following informat

Seite 149

Chapter 6: StiffenersClose-Punch Laminated Stiffener (2 Ga) with an Insert (10–14 Ga) toa Laminated Base Stiffener (2–5 Ga) with a Base Insert (2–14 G

Seite 150

Chapter 6: StiffenersBase Stiffener (10–16 Ga) to a Base Boot ConnectionReference the following information when connecting a base stiffener (CTS-2123

Seite 151

Chapter 6: StiffenersClose-Punch Connection for a Base Stiffener (2+2 Ga – 8 Ga) to aBase BootReference the following information for a close-punch co

Seite 152 - Assembly of Roof Exhauster

Chapter 6: StiffenersClose-Punch Laminated Base Stiffener (2 Ga) with Insert(2+14 to 2+10 Ga) to a Base BootReference the following information when c

Seite 153

Chapter 6: Stiffeners12–Bolt Pattern Close-Punch Laminated Stiffeners with InsertReference the following information for a close-punch connection of t

Seite 154

1 Safety PrecautionsTopics Covered in this Chapter▪ Safety Guidelines▪ Cautionary Symbols▪ Safety Decals▪ Safety Sign-off SheetSafety GuidelinesSafety

Seite 155

Chapter 6: StiffenersClose-Punch 12–Bolt Pattern Laminated Stiffener to LaminatedBase Stiffener with an Inserts to a Base BootReference the following

Seite 156 - Assembling the Auto Roof Vent

Chapter 6: StiffenersClose-Punch 12–Bolt Pattern Laminated Stiffener to LaminatedBase Stiffener with an Inserts to a Base BootReference the following

Seite 157

Chapter 6: StiffenersAll information, illustrations, photos, and specifications in this manual are based on the latestinformation available at the tim

Seite 158

7 Roof AssemblyTopics Covered in this Chapter▪ Attaching the Inside Stiffener to the Top Outside Stiffener▪ Attaching the Eave Bracket to the Inside S

Seite 159 - Installing the Roof Vents

Chapter 7: Roof AssemblyNOTE: Do not tighten the nuts (C) until all hardware has been installed attaching the inside stiffener (CTS–2069XX) to the sid

Seite 160 - Installing the Manway Cover

Chapter 7: Roof AssemblyFigure 7-2 Inside stiffener to the two-ring top stiffener for bins with an even number of ringsA Sidewall E Corrugation spacer

Seite 161 - Ladder Section Assembly

Chapter 7: Roof AssemblyAttaching the Eave Bracket to the Inside StiffenerEave brackets secure the roof rafter to the sidewall.Before You BeginInstall

Seite 162 - Inside Ladder Placement

Chapter 7: Roof AssemblyAttaching the Eave Angle to the Sidewall SheetThe eave angle secures each lower portion of the roof panels.What You Should Kno

Seite 163

Chapter 7: Roof AssemblyFigure 7-4 Exploded view of eave angle (four roof panels)A First eave angle (CTR-0187) H Eave bracket (CTR-0241)B 5/16 in. fla

Seite 164

Chapter 7: Roof AssemblyConnecting the Tension Member to the Eave BracketTension members connect to the eave brackets and are installed around the ins

Seite 165

Chapter 1: Safety PrecautionsFollow Safety Instructions — Read and Understand Manual• Carefully read all safety messages in this manual and safetysign

Seite 166

Chapter 7: Roof AssemblyAssembling the RaftersFor the 135 ft diameter bins, each rafter will consist of a two piece design and will need to be spliced

Seite 167

Chapter 7: Roof AssemblyFigure 7-6 A-frame assembly (Note: complete A-frame assembly shown for clarity)AUpper rafter (CTR-0236)E1/2 in. flange nut (S-

Seite 168

Chapter 7: Roof AssemblyFigure 7-7 Exploded view of center collar rafter clipsARoof rafterDLeft center collar rafter clip (CTR-0499)BRoof panel holeER

Seite 169

Chapter 7: Roof AssemblyAbout Temperature Cable Brackets and A-Frame AssembliesTemperature cable bracket installation locations must be considered pri

Seite 170

Chapter 7: Roof AssemblyFigure 7-8 A-frame installation sequence and temperature cable locations for 135 ft diameter binA12.3 ft radius location C 55.

Seite 171

Chapter 7: Roof AssemblyTable 7-1 A-frame installation sequence and temperature cable locations for 135 ft diameter binA-frame number Rafter NumberTem

Seite 172

Chapter 7: Roof AssemblyTable 7-1 A-frame installation sequence and temperature cable locations for 135 ft diameter bin (cont'd.)A-frame number R

Seite 173

Chapter 7: Roof AssemblyFigure 7-9 Installing a temperature cable bracketARoof rafterDLeft purlin clip (CTR-0315)B10 in. temperature cable bracket (CT

Seite 174

Chapter 7: Roof AssemblyFigure 7-10 Supplier quick linkA PurlinC Supplier quick linkB Temperature cable bracket (CTR-0317)Attachment Locations of Purl

Seite 175

Chapter 7: Roof AssemblyFigure 7-11 Location of purlins for a 135 ft (41.1 m) diameter binsAPurlin number 1 (CTR-0297)EPurlin number 5 (CTR-0309)BPurl

Seite 176

Chapter 1: Safety Precautions• Wear gloves to protect your hands from sharp edges onplastic or steel parts.Gloves• Wear steel-toed boots to help prote

Seite 177

Chapter 7: Roof AssemblyAssembling a Laminated PurlinLaminated purlins nest together to give additional strength and should be assembled before constr

Seite 178

Chapter 7: Roof AssemblyAssembling Purlin Number 8Purlin number 8 is located eighth from the eave.Before You BeginPlace two roof rafters on the ground

Seite 179

Chapter 7: Roof AssemblyFigure 7-13 Purlin location 8ALeft-hand upper roof rafter (CTR-0236)F1/2 x 1-3/4 in. flange bolt (S-10252)B1/2 x 1-3/4 in. fla

Seite 180 - Wind Ring Requirements

Chapter 7: Roof AssemblyThe A-frame assembly consists of two roof rafters identified as the left-hand roof rafter (A) and the right-hand roof rafter (

Seite 181 - Installing Wind Rings

Chapter 7: Roof AssemblyFigure 7-14 Purlin location 7A Left-hand upper roof rafter (CTR-0236) H Purlin (CTR-0311)B1/2 x 1-3/4 in. flange bolt (S-10252

Seite 182

Chapter 7: Roof AssemblyAssembling Purlin Number 6Purlin number 6 is located sixth from the eave.Before You BeginPlace two roof rafters on the ground

Seite 183

Chapter 7: Roof AssemblyFigure 7-15 Purlin location 6A Left-hand upper roof rafter (CTR-0236) H Purlin (CTR-0310)B1/2 x 1-3/4 in. flange bolt (S-10252

Seite 184

Chapter 7: Roof AssemblyAssembling Purlin Number 5Purlin number 5 is located fifth from the eave.Before You BeginPlace two roof rafters on the ground

Seite 185 - Conditions and Limitations:

Chapter 7: Roof AssemblyFigure 7-16 Purlin location 5A Left-hand upper roof rafter (CTR-0236) H Purlin (CTR-0309)B1/2 x 1-3/4 in. flange bolt (S-10252

Seite 186 - CN #309037

Chapter 7: Roof AssemblyAssembling Purlin Number 4Purlin number 4 is located fourth from the eave.Before You BeginPlace two roof rafters on the ground