Guidelines for TemperatureCables on 40-Series BinsPNEG-1924Version 1.0Date: 02-18-13PNEG-1924
105 ft Diameter BinFigure 1-9 A-frame installation sequence and temperature cable locations for 105 ft diameter binA5 ft radius location (center colla
135 ft Diameter BinFigure 1-10 A-frame installation sequence and temperature cable locations for 135 ft diameter binA12.3 ft radius location C 55.4 ft
NOTES12 Pneg-1924
GSI Group, LLC Limited WarrantyGSI Group, LLC Limited WarrantyThe GSI Group, LLC (“GSI”) warrants products which it manufactures to be free of defects
This equipment shall be installed in accordance with thecurrent installation codes and applicable regulationswhich should be carefully followed in all
All information, illustrations, photos, and specifications in this manual are based on the latestinformation available at the time of publication. The
1 Temperature Cable Guidelines for40–Series Bins Equipped with theZ-Tek™™ Roofing System.Temperature cable brackets are provided by GSI as standard eq
Figure 1-2 Typical Center Collar Installation (Where Applicable)C Supplier quick linkDCenter collar temperature cable holeFigure 1-3 Starting Lengths
60 ft Diameter BinFigure 1-4 A-frame installation sequence and temperature cable locations for 60 ft diameter binA3 ft radius location (center collar)
72 ft Diameter BinFigure 1-5 A-frame installation sequence and temperature cable locations for 72 ft diameter binA9.3 ft radius locationB26 ft radius
75 ft Diameter BinFigure 1-6 A-frame installation sequence and temperature cable locations for 75 ft diameter binA5 ft radius location (center collar)
78 ft Diameter BinFigure 1-7 A-frame installation sequence and temperature cable locations for 78 ft diameter binA5 ft radius location (center collar)
90 ft Diameter BinFigure 1-8 A-frame installation sequence and temperature cable locations for 90 ft diameter binA5 ft radius location (center collar)
Kommentare zu diesen Handbüchern